DBIZ AI MES — Factories that self-optimize on real-time OEE, with AI Agent

DBIZ AI MES

A self-optimizing factory — driven by real-time OEE, with AI Agent.

Measure Actual OEE from SCADA/PLC & IoT (not estimates), APS scheduling, quality control, and predictive maintenance — together with AI OEE Engine turning reports into action. LeePak saves 28% time & cost.

30 minutes · tailored to your manufacturing industry · no installation needed
87% OEE achieved
−28% time & cost (LeePak)
6 Factory AI Agents
Security & international-standards compliance are in the DNA of every DBIZ product
Core backbone · OEE

OEE = Availability × Performance × Quality

DBIZ MES measures real OEE from machine signals, not estimates — so every improvement traces back to a root cause.

Availability
92%
Actual run time vs. plan — minus downtime and changeover.
×
Performance
95%
Actual speed / theoretical speed of the machine.
×
Quality
99%
Good units / total output — minus defects and rework.
=
87%
OEE

7 international-standard OEE screen groups: Overview · Availability · Performance · Quality · Data sources · Production↔Maintenance · AI Recommendation.

MES module

Enough functionality for the factory to run itself

From machine monitoring to warehousing and product lifecycle — on one data platform.

Real-time monitoring

Track every machine and stage from SCADA/PLC & IoT — status, speed, and instant alerts.

Real-time monitorSCADA/PLCIoT sensor

OEE Analytics

4 KPIs (OEE/A/P/Q), trends, radar, equipment ranking, insights & recommendations.

Downtime & reason codePM vs BreakdownChangeover

Production scheduling (APS)

Capacity-based planning and scheduling with order prioritization — less waiting, optimized changeover.

PlanSchedulingProcess step

Quality control (QC)

QC templates (numeric/select/bool), NCR, auto-reject, lot tracing — Quality feeds straight into OEE.

QCTemplateNCRLot traceability

Predictive maintenance (eAM)

Equipment, spare-part, and maintenance-schedule management; IoT failure prediction to reduce downtime.

eAMPredictiveWork Order

Warehouse (WMS) & product lifecycle (PLM)

Stock in/out by transaction type, batch/QR inventory; and formula & product lifecycle management.

WMSStock by batch/QRPLM
Why DBIZ’s OEE is trustworthy

OEE is the front end — the power lies in the 3 layers beneath

More than just “a pretty dashboard”: DBIZ invests properly in the real data layer so OEE is measured, not estimated.

Layer 1 · Front end — OEE Dashboard
OverviewAvailabilityPerformanceQualityAI Recommendation
Layer 2 · Business
APS schedulingQuality controlMaintenance (eAM)Work OrderWMS
Layer 3 · Real data sources
SCADA / PLCIoT SensorScale / Flow meterQC input formDowntime entry

Real data from layer 3 → layer 2 operations → display & recommendations at layer 1. Measure right and improvements follow.

AI OEE Engine · 6 AI Agents

From “reporting” to “an assistant that takes action”

AI doesn’t just draw charts — it finds causes, forecasts, and recommends actions tied directly to Work Orders; people approve.

Agent 01

Root Cause

Trace the root cause of OEE drops (machine, shift, materials, changeover).

Agent 02

Predictive OEE

Forecast OEE and cyclical failure risk for early prevention.

Agent 03

Impact Simulator

Simulate “what-if” impacts of changes on OEE before doing it for real.

Agent 04

Action Rank

Rank actions by impact/effort, tied directly to the Work Order.

Agent 05

Predictive maintenance

Alert on imminent equipment failure from IoT signals to schedule maintenance in time.

Agent 06

QC Vision

Detect visual defects with AI vision, pushing data into Quality/OEE.

Proven results

Real numbers from a factory using DBIZ MES

0%
Production time & cost
LeePak
0%
OEE achieved
0%
User experience
LeePak
0
AI Agents that run the factory
LeePakViglaceraHoa SenSuntoryUS MasterbatchCharm Ming

Real results from DBIZ customers; varies by scope & the current state of each plant.

Before you decide

The most candid questions

Can the MES connect to my existing machines/PLCs? +
Yes. DBIZ MES connects SCADA/PLC, IoT sensors, scales, and flow meters to capture real signals; machines that aren’t yet digitized can enter downtime/QC manually at first, then be digitized gradually.
My OEE is currently “estimated” — how is DBIZ different? +
DBIZ measures OEE from real data (counts from PLCs, downtime with standard reason codes, QC entered at the source) instead of estimating from event counts — so improvements trace back to root causes.
Will deployment disrupt production? +
Following a 3-phase roadmap: “OEE Foundation” (4–6 weeks) standardizes the first 4 groups on existing data; then feeds in real data; and finally turns on the AI OEE Engine — running in parallel, with no machine downtime.
Does AI control machines on its own? +
No. AI recommends actions (mold changes, maintenance schedules, rescheduling) and ranks them by impact; operators approve, and every change is traced.
Does it integrate with ERP/inventory? +
Yes. MES shares one platform with DBIZ’s ERP, WMS, and PLM — production orders, batch/QR inventory, and costing flow seamlessly, with no duplicate data entry.
DBIZ AI MES

Ready for a factory that self-optimizes for OEE?

Book a 30-minute session — we’ll assess your current OEE, estimate improvements, and sketch a roadmap starting from one production line. No commitment needed.

Free · no obligation · your data always stays on your infrastructure.
24/7
Customer support
4–6 weeks
OEE Foundation
18+ years
Experience from SSG